Yob said:
I'm still very unsure of what equipment we have and what we still need..
Yeah, trying to get onto it.
I might need a PM or 2 from those that have prepared these recipes before. TBH, i have no idea how to estimate the gear we're gonna need, so i was hoping to find a list of what was used at the previous CS Brews - namely the 2015 Xmas in July (this is essentially going to be the same as the Wee Heavy effort).
So if anyone has the gear list (i assume it was a group PM at the time?), could they please PM a copy of it to me.
Otherwise, i'll have to guesstimate it myself :unsure:
What roughly have system losses been on these rigs? ~20%?
Is the rule of ~1L lost per kg of grain correct for MLT losses, or does the weight of the larger bulk of grain minimise this?
I'm estimating we need roughly: 462L into cubes, plus ~20-50L lost in bottom/trub, plus ~40-100L boil-off, plus ~150L grain absorption. Total of ~800L needs to be obtained after the mash & sparge.
All kettles need to be gas, as electricity will be at a premium for running the pumps (& HEX's) - does anyone have a gas HEX?
-------
Currently i'm assuming we need roughly:
1-2 grain mills (preferably w motor/drill)
3 large mashtuns, enough to fit 150kg grain, say 3x200L. (so i'm assuming 50kg per 200L MLT is ok)
2 pumps
Idzy's massive 500L kettle + burner (cheers, Adam!!)
at least 1x 200L kettle (could be smaller - needed for a side boil) + burner
preferably another 200L kettle (extra heating for HLT water, could also be smaller) + burner
2-4 HEX's to help keep MLT water at temp & mashout.
truckloads of hoses & cam locks (i'm assuming if everyone just brings some, this'll work out.
Several (large) gas bottles - no idea of the gas usage of the required burners. (plus water bath to prevent gas freezing)
------------------------
So first up, we need to determine what we need, then form it into a list, then see who can supply it.
EDIT: form idzy's post#164:
"
Posted 02 November 2016 - 10:56 PM
Fellas, I have made a few calls, pulled a few favours, spent a few dollars and can confirm that I will be bringing the following gear:
- Kettle (600 litres) - gas fired
- White MLT (275 litres) - need to build a manifold
- Blue MLT (275 litres)
- White MLT (155 litres)
- HLT (180 litres) - gas fired - need to build a stand
- HEX (internal/external element) with 2x STC-1000 - 2x20amp req'd
Cheers,
Idzy"
So as wiggas just mentioned (snuck his post in before me, great minds think alike B) ), if idzy's white MLT is up & running, that'll probably have us sorted for MLT's; and if his HLT is also up & running, that leaves us with probably 1 other large kettle to source (for the side boil).
... So basically, if Adam rocks up with his gear, we're 90% there. Yay for Idzy!!