For those in NSW and beyond, in the third lot, that is what Derrin has said about yours.
Hi Eric,
Let everyone know we're good on the boards, I'm building circuits as fast as I can to get caught up. The hold up now is with stir bars I expected long before the boards that still aren't here. They should be here Thursday at which point I anticipate having all the plates built, tested and packed waiting for stir bars to get throw on top, sealed and shipped. Should make Christmas with enough time to brew something fast like a hefe or Saison and be drinking it (young) on New Years!
:icon_cheers: