You're in 'berra? Unless you're planning lagers, you're going to need the cool as much as me in Melb's.sjp770 said:The rewiring was as simple as pulling off the thermostat inside the fridge and by passing it. The controller has compressor protection as well.
How much heat will the fermentation put off? My controller is only cool or heat so I cant put a heat mat in the fridge unless I replace it.
I ended up getting some connectors via this guy on eBay.mofox1 said:Same here. They also do the crimp terminals sjp is after -
http://www.ebay.com.au/itm/131040780107
I needed some ring terminals for ground lugs... SJP - if you haven't got all the bits for those I picked up a bunch of star/spring/flat washers and bolts etc from http://stores.ebay.com.au/stainlesshop/
Mick
What paint did you use?sjp770 said:Paint job was average.. I should have heated up the metal and paint first. it would have been sub 10c at that time even with the sun on it
Also the color of charcoal was not quite dark enough.
Looks like there's plenty of electric panels being built lately!sjp770 said:I hope it wasn't from a link on my thread that you got the wrong ones!
Just a note on that, I will do a full Bill of Materials once I have the panel functional with notes as to why I changed a part or which part is different.
I also have another hole punch on the way for the elements, which arrived the other day.
Any reason for this?sjp770 said:The plan is to get everything mounted then spray the back panel a bright orange.
Enter your email address to join: