Almost complete.
All the buttons and the 12v side is connected and ready. All the sockets, SSRs, power supply and heat sink are installed. The 240v bits just need wiring up. I'll include enough twin and earth wire to complete the project. I've made up 2x 240v input leads too. All the plugs are included.
Temp probe included too.
$100 bucks plus shipping.
All the buttons and the 12v side is connected and ready. All the sockets, SSRs, power supply and heat sink are installed. The 240v bits just need wiring up. I'll include enough twin and earth wire to complete the project. I've made up 2x 240v input leads too. All the plugs are included.
Temp probe included too.
$100 bucks plus shipping.