I have the STC-1000 wired up and tested.
So now time to drill the fridge and put in the sensor, and the heater wire. I note the STC-1000 Manual says (in Perfect Chinese English) "The sensor down-lead and power wire should be kept a proper distance"
I was going to put a 19mm (3/4) gland through the top of the fridge (thought there was the least chance of hitting anything up there) and run both wires through it. Should I go for two holes instead?
Cheers
Steve
So now time to drill the fridge and put in the sensor, and the heater wire. I note the STC-1000 Manual says (in Perfect Chinese English) "The sensor down-lead and power wire should be kept a proper distance"
I was going to put a 19mm (3/4) gland through the top of the fridge (thought there was the least chance of hitting anything up there) and run both wires through it. Should I go for two holes instead?
Cheers
Steve