freezkat
Well-Known Member
- Joined
- 16/8/11
- Messages
- 651
- Reaction score
- 2
Cold water passes through a 3way valve and into an on-demand water heater then it dumps into an insulated tank.
From that tank via another 3 way gate valve can recirculate through the heater and tank till it gets up to mash temperature. From there the water can go to the MLT.
In the MLT it can do it's Mashing and afterward Recirculative Laudering via another pump and dual 3way valve system...Whilst that is going on various required temperatures of strike waters etc... can be heating up back at the heater loop.
Once it's made wort we can gravity feed to the boil pot.
I'm just trying to learn these methods. I wouldn't actually put this together, I think it would work. Yes I am aware there are some critically important shut off valves and power off switches missing.
Cheers
Bob
From that tank via another 3 way gate valve can recirculate through the heater and tank till it gets up to mash temperature. From there the water can go to the MLT.
In the MLT it can do it's Mashing and afterward Recirculative Laudering via another pump and dual 3way valve system...Whilst that is going on various required temperatures of strike waters etc... can be heating up back at the heater loop.
Once it's made wort we can gravity feed to the boil pot.
I'm just trying to learn these methods. I wouldn't actually put this together, I think it would work. Yes I am aware there are some critically important shut off valves and power off switches missing.
Cheers
Bob