slcmorro
87 Warning Points. Bad Boy!
So, I'm almost there. Been doing kits and partials for a while, and I'm almost at the stage where I'll be doing my first BIAB.
Just waiting on my 4 ring gas burner to arrive: http://www.graysonline.com/retail/sitrorb4/sporting--leisure-good/large-cast-iron-ring-burner?spr=true which cost me a grand total of $55 delivered. Should be here today or tomorrow.
I've got a 50L keggle with an outlet and tap, kindly donated to me by Vic45 and a 36L Esky I had lying around (same as this one): http://www.kellyscamping.com.au/p/1098825/Esky-True-Blue-Litre-Cooler-.html?gclid=CNnI_Zmy0bkCFWRepgodogMA8A which already has a spigot valve built into it, for draining out the wort after mashing.
I'm meeting up with a few of the boys from BAR tomorrow (who have already been very helpful and generous), and I'll be picking their brains a bit further, but I figured after reading through some of the guides and posts on these forums, I think I'm pretty right.
I've got a 1.5m x 1m piece of swiss voile to line the Esky/Mash Tun which fits nicely, an immersion chiller on the way, a 9KG gas bottle to use for boiling, some digital kitchen scales, some tubs with lids for storing grain, the usual hydrometers, mash paddles, starsan spray bottles, wash tub, food grade tubing, hose clamps etc etc and some bricks to make a makeshift stand for the burner/keggle.
Is there anything I am missing other than a mill (will beg the use of one of the BAR members ones until I get my own)?
Just waiting on my 4 ring gas burner to arrive: http://www.graysonline.com/retail/sitrorb4/sporting--leisure-good/large-cast-iron-ring-burner?spr=true which cost me a grand total of $55 delivered. Should be here today or tomorrow.
I've got a 50L keggle with an outlet and tap, kindly donated to me by Vic45 and a 36L Esky I had lying around (same as this one): http://www.kellyscamping.com.au/p/1098825/Esky-True-Blue-Litre-Cooler-.html?gclid=CNnI_Zmy0bkCFWRepgodogMA8A which already has a spigot valve built into it, for draining out the wort after mashing.
I'm meeting up with a few of the boys from BAR tomorrow (who have already been very helpful and generous), and I'll be picking their brains a bit further, but I figured after reading through some of the guides and posts on these forums, I think I'm pretty right.
I've got a 1.5m x 1m piece of swiss voile to line the Esky/Mash Tun which fits nicely, an immersion chiller on the way, a 9KG gas bottle to use for boiling, some digital kitchen scales, some tubs with lids for storing grain, the usual hydrometers, mash paddles, starsan spray bottles, wash tub, food grade tubing, hose clamps etc etc and some bricks to make a makeshift stand for the burner/keggle.
Is there anything I am missing other than a mill (will beg the use of one of the BAR members ones until I get my own)?