Howdy Brewers,
well the time has finally come around, I have started construction on my Brewstand to go all AG.
I'll post construction pics here for all to see along the way.
The Frame has been constructed of 50mm x 50mm 3mm box tube its rock solid.
Got all the steel for nix from a mate down the road were off to a good start.
Many thanks to Linz and Pumpy for there inspiration and to all the other brewers here on AHB for there knowledge.
So let the Construction begin
The Brewstand
Still got a little welding to go on the top to hold the vessels
Here is a vessel with the top cutout and lid fitted
And the type of valves Im using on the project Stainless Steel Food Grade 3 piece taps
Heres a quick mockup steel to be welded in place
Will keep you all posted
Franko
well the time has finally come around, I have started construction on my Brewstand to go all AG.
I'll post construction pics here for all to see along the way.
The Frame has been constructed of 50mm x 50mm 3mm box tube its rock solid.
Got all the steel for nix from a mate down the road were off to a good start.
Many thanks to Linz and Pumpy for there inspiration and to all the other brewers here on AHB for there knowledge.
So let the Construction begin
The Brewstand
Still got a little welding to go on the top to hold the vessels
Here is a vessel with the top cutout and lid fitted
And the type of valves Im using on the project Stainless Steel Food Grade 3 piece taps
Heres a quick mockup steel to be welded in place
Will keep you all posted
Franko