Crusty
Well-Known Member
Hi guys,
I am almost finished my 3V herms brewery & have decided to go down the 50lt Braumeister route. In order to finish this rig, you will need an electrical control box, a brewstand & someone to hard plumb the 2 x 23jet Mongolian burners. The brewery consists of 3 x 50lt keggles.
Mash tun has 12" domed stainless false bottom hard plumbed with copper pickup tube, beerbelly liquor return dish & a male camlock installed for liquor return.
HLT has a copper elbow installed with polycarbonate sight glass installed via compression fitting. A 1/2" socket is also installed to house the MashMaster DEI controller temp probe.
Boil kettle has a 1/2" copper elbow installed for whirlpooling. All keggles have stainless 1/2" 3-piece ball valves installed with 1/2" stainless camlocks fitted. I have 6 stainless 1/2" 3-piece ball valves with matching camlocks fitted in total.
Herms pot, 7.6lt stainless stockpot with 2400watt element installed through bottom of pot, 1/2" camlock installed for wort entry & 1/2' camlock installed at top of pot into a stainless t-piece for wort exit. the other side of the T has a stainless reducing bush 1/2"-1/4" for RTD, PT100 temp probe. 1/2" copper coil.
PID controller, SSR, ramp, soak, kiln
RTD, PT100 4" temp probe
40A SSR
40A Heat sink
March 809 Pump
2 x 23jet Mongolian burners, 1 brand new the other second hand
400mj/hr regulator with hose, capable of running 3 x mongolian burners with ease
MashMaster DEI-106H controller for HLT temp monitoring
4 x jaycar red illuminated switches for control box, 1 for MM controller, 1 for PID, 1 for March pump & the last one for herms element.
4 x female stainless 1/2" camlocks with 1/2" stainless hosetails installed.
I have been working on this project for just on a year now & have spent in excess of of what the Braumeister would cost so need to recoup some funds. Anyone genuinely interseted can send me a PM with an offer & we can go from there.
Cheers
I am almost finished my 3V herms brewery & have decided to go down the 50lt Braumeister route. In order to finish this rig, you will need an electrical control box, a brewstand & someone to hard plumb the 2 x 23jet Mongolian burners. The brewery consists of 3 x 50lt keggles.
Mash tun has 12" domed stainless false bottom hard plumbed with copper pickup tube, beerbelly liquor return dish & a male camlock installed for liquor return.
HLT has a copper elbow installed with polycarbonate sight glass installed via compression fitting. A 1/2" socket is also installed to house the MashMaster DEI controller temp probe.
Boil kettle has a 1/2" copper elbow installed for whirlpooling. All keggles have stainless 1/2" 3-piece ball valves installed with 1/2" stainless camlocks fitted. I have 6 stainless 1/2" 3-piece ball valves with matching camlocks fitted in total.
Herms pot, 7.6lt stainless stockpot with 2400watt element installed through bottom of pot, 1/2" camlock installed for wort entry & 1/2' camlock installed at top of pot into a stainless t-piece for wort exit. the other side of the T has a stainless reducing bush 1/2"-1/4" for RTD, PT100 temp probe. 1/2" copper coil.
PID controller, SSR, ramp, soak, kiln
RTD, PT100 4" temp probe
40A SSR
40A Heat sink
March 809 Pump
2 x 23jet Mongolian burners, 1 brand new the other second hand
400mj/hr regulator with hose, capable of running 3 x mongolian burners with ease
MashMaster DEI-106H controller for HLT temp monitoring
4 x jaycar red illuminated switches for control box, 1 for MM controller, 1 for PID, 1 for March pump & the last one for herms element.
4 x female stainless 1/2" camlocks with 1/2" stainless hosetails installed.
I have been working on this project for just on a year now & have spent in excess of of what the Braumeister would cost so need to recoup some funds. Anyone genuinely interseted can send me a PM with an offer & we can go from there.
Cheers