Well the AG setup is finally finished and tomorrow is the big day. Just going to run some PBW through the gear then its on! 1st AG. I'm doing the LCBA clone from the recipe database.
Here's a pic of the gear minus burners. I will be no chilling so the kettle will drain into a cube on the floor.
I went for a more modular design that stacks away under the bench when I'm not using it. I don't have enough room in the shed for one big rig and the thought of 50l of boiling liquid on a milk crate scares me.
Now I just have to make sure there's enough cold beer to get me through the process :icon_cheers:
Cheers
Ian
Here's a pic of the gear minus burners. I will be no chilling so the kettle will drain into a cube on the floor.
I went for a more modular design that stacks away under the bench when I'm not using it. I don't have enough room in the shed for one big rig and the thought of 50l of boiling liquid on a milk crate scares me.
Now I just have to make sure there's enough cold beer to get me through the process :icon_cheers:
Cheers
Ian