g'day all. i am planing an electric brewery, but am looking for ideas/suggestions on how to setup quick disconnects on the temp probe so the mash tun can be easily taken outside for cleaning if required.
i have (i think) got the elements connections sussed,(K Mart kettles) with the IEC plugs.
am planing on a control box type setup where basically every thing plugs into the back of the box,the box can then be taken down off its mounts and stored out off the way when not in use.
any ideas/help would be great....cheers.......spog........
i have (i think) got the elements connections sussed,(K Mart kettles) with the IEC plugs.
am planing on a control box type setup where basically every thing plugs into the back of the box,the box can then be taken down off its mounts and stored out off the way when not in use.
any ideas/help would be great....cheers.......spog........