I've been making a new brew rig, and because I batch sparge I've decided to do away with the HLT.
Strike water I'll heat direct in the mash tun using an immersion element. Sparge water I'll heat in the boiler. As I don't need to drain the first runnings I don't need one vessle to collect the runnings, usually he boiler, and a second for the sparge water, usually the HLT.
Alternativey you could just use the boiler to heat both the strike water and sparge water.
Get rid of the HLT and it's one less piece of bulky equipment!
Cheers
MAH
Strike water I'll heat direct in the mash tun using an immersion element. Sparge water I'll heat in the boiler. As I don't need to drain the first runnings I don't need one vessle to collect the runnings, usually he boiler, and a second for the sparge water, usually the HLT.
Alternativey you could just use the boiler to heat both the strike water and sparge water.
Get rid of the HLT and it's one less piece of bulky equipment!
Cheers
MAH