H@wkeye!
Well-Known Member
- Joined
- 7/6/15
- Messages
- 107
- Reaction score
- 29
Hi all
Been a while since i posted, so thought i'd start a new thread as to what's going on in my garage atm.
Current in the process of upscalling from by grainfather. Have purchased a 3x70L HERMS pot system from Cheekypeaky brewery. This includes almost everything i need, short of a sparge arm, plate chiller etc. The rig will be run by 4x2200w elements, 2 in the HLT and 2 in the BK. To control these elements, i am attempting to build an electric control box.
Ordered the first parts of this last night. Looking forward to their arrival.
I'll post some pics of progress when the control box parts arrive. Hoping to have the rig fully functional in 6 weeks or so.
Hawk
Been a while since i posted, so thought i'd start a new thread as to what's going on in my garage atm.
Current in the process of upscalling from by grainfather. Have purchased a 3x70L HERMS pot system from Cheekypeaky brewery. This includes almost everything i need, short of a sparge arm, plate chiller etc. The rig will be run by 4x2200w elements, 2 in the HLT and 2 in the BK. To control these elements, i am attempting to build an electric control box.
Ordered the first parts of this last night. Looking forward to their arrival.
I'll post some pics of progress when the control box parts arrive. Hoping to have the rig fully functional in 6 weeks or so.
Hawk