So this is almost finished now, gonna get a locking device fitted to the ground and im gonna push it side-on against the steps and bolt them on to there when i use it as well. The HLT will be hard up against the steps for easy filling/measuring.
2 things i did wrong (apart from all my welds lol) i made the HLT 6inches too high which is not a big drama, and my vase which was level half way through, ended up warped so i had to even it up with small bits of tubing.
I gave it a quick run to clean my copper manifold in the boiler with white vinegar and water, and my thermometer glass blew out! I should have had more water in there i think
After i give it a few goes and see if it needs any changes, i'll clean it up with the grinder and put some rust proof paint on.
You can't see, but under the HLT and Boiler are extra supports so it's just not sitting on a square.
2 things i did wrong (apart from all my welds lol) i made the HLT 6inches too high which is not a big drama, and my vase which was level half way through, ended up warped so i had to even it up with small bits of tubing.
I gave it a quick run to clean my copper manifold in the boiler with white vinegar and water, and my thermometer glass blew out! I should have had more water in there i think
After i give it a few goes and see if it needs any changes, i'll clean it up with the grinder and put some rust proof paint on.
You can't see, but under the HLT and Boiler are extra supports so it's just not sitting on a square.