Looking at making a controller for my brewery, and after feedback on my design. I am planning to use the same pot to heat my water and as the kettle. The gear/details I was thinking of is:
- 809 march pump (already have and is part of the existing wiring I have (fuses, 12v supply)
- PID to control a 2200kw element
- 12v digital thermometer
- PT100 temp probes
- 2 switches for the element - one on/off for element from PID, and an overide, if I just want the element on without PID control
Just after feedback:
- design
- 2200kw element OK for 25L boil
- will all this run OK from a single 10A power point
Any other advice is welcome
Thanks
Dave
- 809 march pump (already have and is part of the existing wiring I have (fuses, 12v supply)
- PID to control a 2200kw element
- 12v digital thermometer
- PT100 temp probes
- 2 switches for the element - one on/off for element from PID, and an overide, if I just want the element on without PID control
Just after feedback:
- design
- 2200kw element OK for 25L boil
- will all this run OK from a single 10A power point
Any other advice is welcome
Thanks
Dave