Crusty
Well-Known Member
After starting my AG adventure back in 2008, I have finally settled on my final brewery.
I started out with a simple Igloo cooler, went to Rims, followed by BIAB & then onto the Braumeister.
All of which are good in their own right but as I now spend a bit of time brewing other beverages, the need has arisen for a larger final volume that requires a much higher FG that couldn't be achieved with my systems of the past.
I'm going back to 3V, fully electric which will enable me to brew up to 20G capacity. I'm looking at 3 x 100L vessels, a couple of march pumps & associated fittings that go with it. The most costly part of the build is the 30A control panel. Everything purchased from the USA & it will be a work in progress as it's bloody expensive just getting the control panel operational. 2 x 5500W elements control the HLT & Boil kettle. 3 x PID controllers will monitor temps etc & a timer for manual input & alarms. I chose not to go with the ramp, soak PID's as this system is more manual & more hands on. Set your temp, set your time & an alarm will sound when it's there. A ramp to the next temp is simply a manual adjustment using the up arrow followed by a reset of the timer & away you go again. All PID's can have alarms set if you wish for high & low temps as well as an alarm for hop additions on the timer. My 50L Braumeister will be up for sale when I get the build closer to operational. Here's the pre-cut 30A control panel from the Electric Brewery. I have the stainless handles, heat sink, power receptacles included. It's on it's way & I've just got to install everything in the pre cut holes when it gets here.
I started out with a simple Igloo cooler, went to Rims, followed by BIAB & then onto the Braumeister.
All of which are good in their own right but as I now spend a bit of time brewing other beverages, the need has arisen for a larger final volume that requires a much higher FG that couldn't be achieved with my systems of the past.
I'm going back to 3V, fully electric which will enable me to brew up to 20G capacity. I'm looking at 3 x 100L vessels, a couple of march pumps & associated fittings that go with it. The most costly part of the build is the 30A control panel. Everything purchased from the USA & it will be a work in progress as it's bloody expensive just getting the control panel operational. 2 x 5500W elements control the HLT & Boil kettle. 3 x PID controllers will monitor temps etc & a timer for manual input & alarms. I chose not to go with the ramp, soak PID's as this system is more manual & more hands on. Set your temp, set your time & an alarm will sound when it's there. A ramp to the next temp is simply a manual adjustment using the up arrow followed by a reset of the timer & away you go again. All PID's can have alarms set if you wish for high & low temps as well as an alarm for hop additions on the timer. My 50L Braumeister will be up for sale when I get the build closer to operational. Here's the pre-cut 30A control panel from the Electric Brewery. I have the stainless handles, heat sink, power receptacles included. It's on it's way & I've just got to install everything in the pre cut holes when it gets here.