Lets see,
90 Long necks in the fridge (give or take)
60 long necks getting ready for the fridge
another 46 lts in the fermentors almost ready to bottle
Ive only been brewing since November, so Im getting there.
I would like to have 300-400 lts ready to go
Once I "secure" a few CUB 50lt kegs, look out.
90 Long necks in the fridge (give or take)
60 long necks getting ready for the fridge
another 46 lts in the fermentors almost ready to bottle
Ive only been brewing since November, so Im getting there.
I would like to have 300-400 lts ready to go
Once I "secure" a few CUB 50lt kegs, look out.