Curly79
Well-Known Member
- Joined
- 5/7/14
- Messages
- 920
- Reaction score
- 471
Gday all, finally getting off my arse and beginning my 4V build. I've got a few different ideas but I'm looking for different opinions so any advice is appreciated.
Here's what I'm thinking. From right to left. 100ltr HLT with ball valve at the bottom and yet to be fitted temp guage half way up.
50Ltr Keggle for my mash tun. Temp guage also needs to be fitted and false bottom with pick up tube to existing ball valve on front of Keggle.
60 Ltr kettle. Still needs a valve fitted. Only had the top cut out so far.
I also have these these two with pre drilled holes?
I'll be rigging up a HERMS or RIMS for recirculating to and from the MT.
I'll also be using gas burners under the HLT and Kettle. Don't have any pumps yet either. Cheers. [emoji106][emoji481][emoji481][emoji481]
Here's what I'm thinking. From right to left. 100ltr HLT with ball valve at the bottom and yet to be fitted temp guage half way up.
50Ltr Keggle for my mash tun. Temp guage also needs to be fitted and false bottom with pick up tube to existing ball valve on front of Keggle.
60 Ltr kettle. Still needs a valve fitted. Only had the top cut out so far.
I also have these these two with pre drilled holes?
I'll be rigging up a HERMS or RIMS for recirculating to and from the MT.
I'll also be using gas burners under the HLT and Kettle. Don't have any pumps yet either. Cheers. [emoji106][emoji481][emoji481][emoji481]