Alex81
Member
- Joined
- 24/6/10
- Messages
- 17
- Reaction score
- 0
Hi all, I am now onto building my second brewery! my first was a 50lt HERMS system made from Kegs. I am now building a 300lt or 80gal brewery. I am building this with the possibility of going commercial nano brewery or just have a kick ass home brewery.
The main specs are
400lt or 105 gal direct fired Kettle 180,000 BTU duckbill burner
300lt or 80 gal mash tun mounted on a tipper with an in line or RIMS system heater.
200lt or 52 gal HLT electrically heated.
2x March 809 magnetic drive pumps
Fittings will be Tri Clover style
Hoses are Pharmaceutical grade silicone
2 stage braised plate heat exchanger.
I am going to use a instant gas hot water system to save on gas and power usage for initial strike temps.
Anyway here is the progress so far..
The main specs are
400lt or 105 gal direct fired Kettle 180,000 BTU duckbill burner
300lt or 80 gal mash tun mounted on a tipper with an in line or RIMS system heater.
200lt or 52 gal HLT electrically heated.
2x March 809 magnetic drive pumps
Fittings will be Tri Clover style
Hoses are Pharmaceutical grade silicone
2 stage braised plate heat exchanger.
I am going to use a instant gas hot water system to save on gas and power usage for initial strike temps.
Anyway here is the progress so far..