Lactobacillus
Well-Known Member
- Joined
- 20/7/06
- Messages
- 46
- Reaction score
- 1
I finally started working on the bar area today. This is taking up half of the garage, so my car will never again be housed within
The wifes half, on the other hand, shall remain spotless <_<
Don't mind the mess, it will all be cleared up in good time.
The "Buisness End"
The flooded font and drip try I picked up a few years back for the princely sum of $100. All I need is the taps (already have them - they cost me nothing, brand new) and 4 x $22 adapters off Ross and I have myself a $200 font!
I will post another few shots when it is all done. I have given myself three weeks, as I go on holiday after that and I want it done before I leave.
Cheers,
The wifes half, on the other hand, shall remain spotless <_<
Don't mind the mess, it will all be cleared up in good time.
The "Buisness End"
The flooded font and drip try I picked up a few years back for the princely sum of $100. All I need is the taps (already have them - they cost me nothing, brand new) and 4 x $22 adapters off Ross and I have myself a $200 font!
I will post another few shots when it is all done. I have given myself three weeks, as I go on holiday after that and I want it done before I leave.
Cheers,