Dicko72
Well-Known Member
- Joined
- 16/9/10
- Messages
- 63
- Reaction score
- 1
Hi All,
I am moving house and alas have to let go of some equipment.
Main things are:
2 x heating/cooling fermentation fridges with temp control enough to have 3 active fermentations
100L insulated electric kettle 2 separate elements 15A with temp adjustment (fast controllable boil)
Monster mill with Ozito drill attached
Feeler guage
3 x plastic fermenters with thermowells fitted
Refractometer, stir plate, oxygen kit and HEAPS of other bits and bobs
$300 FOR THE LOT!!
Any questions just let me know.
Cheers
I am moving house and alas have to let go of some equipment.
Main things are:
2 x heating/cooling fermentation fridges with temp control enough to have 3 active fermentations
100L insulated electric kettle 2 separate elements 15A with temp adjustment (fast controllable boil)
Monster mill with Ozito drill attached
Feeler guage
3 x plastic fermenters with thermowells fitted
Refractometer, stir plate, oxygen kit and HEAPS of other bits and bobs
$300 FOR THE LOT!!
Any questions just let me know.
Cheers
Last edited: