stilvia
Well-Known Member
- Joined
- 28/10/15
- Messages
- 109
- Reaction score
- 36
Hi All,
Just thought I'd share this little project I put together a month or so back. Got inspired after looking at the WilliamsWarn unit and thought I could make something similar myself.
I figured the top off of a Grolsch bottle was a good start for the seal. It also had a large enough center to drill for the 6mm beer line to pass through and a 1.5mm hole for a PRV. The frame was bent up from 3mm aluminium sheet. I used stainless threaded rod to hold the platform and used springs to provide a seal. A mate at work 3D printed some bushes for the threaded rod to go through the top sheet. I've used 2 JG valves and a JG Y-piece to provide CO2 and beer. Depending on how the PRV is set, takes around 40 seconds to fill.
Price cost me $70 all up for everything including the aluminium cut to size and bent. Can definitely recommend going down this path for the cost.
Just thought I'd share this little project I put together a month or so back. Got inspired after looking at the WilliamsWarn unit and thought I could make something similar myself.
I figured the top off of a Grolsch bottle was a good start for the seal. It also had a large enough center to drill for the 6mm beer line to pass through and a 1.5mm hole for a PRV. The frame was bent up from 3mm aluminium sheet. I used stainless threaded rod to hold the platform and used springs to provide a seal. A mate at work 3D printed some bushes for the threaded rod to go through the top sheet. I've used 2 JG valves and a JG Y-piece to provide CO2 and beer. Depending on how the PRV is set, takes around 40 seconds to fill.
Price cost me $70 all up for everything including the aluminium cut to size and bent. Can definitely recommend going down this path for the cost.