First brew on the new system put to bed. All up to the yeast now.
I've got some more building to do with the brewery so I'll keep updating as I'm going.
Probably won't be for a couple of months because I'm due back to work next weekend.
The work I want to complete will be the counterflow chiller and oxygenation kit.
Flow controller from link above.
Stainless top for the stand.
3 way valves for brewery.
Way way down the track I'm planning a uni tank or two and glycole or ice bank system controlled from the BCS and able to read from sea at work.
Be nice to link in one of those digital specific gravity readers so I can read remotely too.
That's a while down the track.
Thanks everyone for the interest and kind comments.
Happy brewing [emoji4] [emoji5] [emoji4]