mb-squared
Well-Known Member
- Joined
- 18/2/14
- Messages
- 392
- Reaction score
- 153
thanks for the suggestion dave81. I had thought of doing exactly as you say, but ultimately I decided that it was a bit overkill. my control panel is fed by two separate 32A leads so it would require two additional contactors/switches/fuses etc. since the two 32A GPOs (switched) are within an easy reach, it strikes me as an unnecessary redundancy.
hey Mike, I brew 55-60L batches. usually boil for 90mins. I'm keen to see how the 5500W elements compare against my 4-ring HP burners. definitely cleaner and quieter, but will they be quicker?
matto
hey Mike, I brew 55-60L batches. usually boil for 90mins. I'm keen to see how the 5500W elements compare against my 4-ring HP burners. definitely cleaner and quieter, but will they be quicker?
matto