Finally have an update on the shed.
Slow going due to some pretty bad weather.
Don't have any external pics as it was dark when i took these.
Still a bit of work to be done before the brewing starts, wasn't going to clad the walls internally, but decided it would be much nicer with it done, so will start that on the weekend. Once the walls are done, ill build the workbench, brewbench, then finish of the brauduino so i can start brewing!!!!
The shed is fully clad externally, horizontal colourbond cladding, roof is also colourbond with a few sheets of laserlite as a skylight.
Roller door is 3.3m wide.
Some internal pics.
North East corner of the shed, that corner will have a 3m x 3m workbench in the corner.
North west corner of the shed, toilted on the far wall, wet area where the saw horses are, will be all tiled with drain in the floor for clean up. hot water system under a sink. Brewing rig will be where the power point is to the right of the saw horses.
15amp power & 10amp. Water above brewrig. Will have a winch on the roof to lifting malt pipe/malt bag.
South East corner. Will be making a bar that will come out from the wall roughly where the switchboard is.
Middle of the right hand wall will have a tv, stereo etc.
North wall
West wall,