Dan Pratt
Well-Known Member
- Joined
- 28/1/10
- Messages
- 3,279
- Reaction score
- 1,274
After my recent upgrade to the bar from a single tap to 4 tap flooded font, the time has come to connect all the beer lines to the Barbed Black Disconnects.
Ive tried pliers and boiling water but its a f*ckn mission to get them on....can someone please give a simple solution to this task?
Ive tried pliers and boiling water but its a f*ckn mission to get them on....can someone please give a simple solution to this task?