Selling my original 3V system built from decommissioned kegs.
currently using it as a kettle rims system.
BK - 50l keg, sight glass, 2x3 piece ball valves, 2x2.2kw heating elements, 1xthermowell, 1xglass cover
MT - 50l keg, mechanical temp probe, 1x3 piece ball valve, 1xthermowell on recirc inlet
HLT - 50l keg, sight glass, 1x3piece ball valve, 1xthermowell, 0xheating element atm
Pumps - 2xkegland magnetic drive
all hoses and camlock
hex - 3 stage Self draining All copper counterflow chiller 100 to 30 in 15 min using Brisbane ground water
2xkegland temp controllers
currently using it as a kettle rims system.
BK - 50l keg, sight glass, 2x3 piece ball valves, 2x2.2kw heating elements, 1xthermowell, 1xglass cover
MT - 50l keg, mechanical temp probe, 1x3 piece ball valve, 1xthermowell on recirc inlet
HLT - 50l keg, sight glass, 1x3piece ball valve, 1xthermowell, 0xheating element atm
Pumps - 2xkegland magnetic drive
all hoses and camlock
hex - 3 stage Self draining All copper counterflow chiller 100 to 30 in 15 min using Brisbane ground water
2xkegland temp controllers