For any interest sake, if people are looking for a boiler i scored this pot for $89, its 55cm wide by 55cm deep ~120Lt
I brewed a 120Lt batch on the weekend, and the limiting factor was my mash tun, however I am sure with more practice I could push to 100Lt if i was silly enough
Sorry about the messy brewery, but I was building bits and i was brewing and its very much in "beta" stage
once I have it sorted I will have the controllers and lines all cleaned up. (The control PCB and screen etc was behind out of sight)
I will keep it updated when i get back from holidays.
My current issues are 2400 watts arent enough for the large batch, where I was heating 44Lt for mash and 50Lt+ for sparge. It took far too long, and my beta herms was very slow to heat up this large mass.....
I might add a flame under the mash tun in the even i need to heat that up in a rush, as well as the herms for temp maintaining. The burner (3 ring) was fine under the 120Lt pot, as well as 2400 electric inside.
The HTL might need some help via gas also. I used the hot water tap to fill it for sparge and that helped but i thing more "fire power" is required for the big batches.
Having 3 electric elements also, i control with the micro to limit the 10amp (std. output) however i might use 2 circuits in the house so i have 20Amps now (eg herms on and HLT) to limit the delay.
Big brew day but least the brew "plan" is getting closer
I brewed a 120Lt batch on the weekend, and the limiting factor was my mash tun, however I am sure with more practice I could push to 100Lt if i was silly enough
Sorry about the messy brewery, but I was building bits and i was brewing and its very much in "beta" stage
once I have it sorted I will have the controllers and lines all cleaned up. (The control PCB and screen etc was behind out of sight)
I will keep it updated when i get back from holidays.
My current issues are 2400 watts arent enough for the large batch, where I was heating 44Lt for mash and 50Lt+ for sparge. It took far too long, and my beta herms was very slow to heat up this large mass.....
I might add a flame under the mash tun in the even i need to heat that up in a rush, as well as the herms for temp maintaining. The burner (3 ring) was fine under the 120Lt pot, as well as 2400 electric inside.
The HTL might need some help via gas also. I used the hot water tap to fill it for sparge and that helped but i thing more "fire power" is required for the big batches.
Having 3 electric elements also, i control with the micro to limit the 10amp (std. output) however i might use 2 circuits in the house so i have 20Amps now (eg herms on and HLT) to limit the delay.
Big brew day but least the brew "plan" is getting closer