just finished the burner head.. needs some finishing off and a stand made.. but she will bring 10ltrs of water to a boil in 10mins from 15C (6.765 kW) i should get better than that now i have made a few more outlets in the manifold and its not licking the outside of the keggle as much (hoping for 8+kW and how much was round the sides at full ball i think i could do that)
Last edited by a moderator: