timmi9191
Well-Known Member
Sacrificed a brew day to update brewing equipment.
Existing keggle and burner (thanks yob) ball valve installed, pump, piping and copper rod for whirlpool. 18m copper immersion chiller. Burner converted from low pressure to high pressure reg - actually not that easy to source a bush to connect the 3 ring buner to the keg king high pressure rg.
Beer consumed but not produced.. But still a productive day!!
Existing keggle and burner (thanks yob) ball valve installed, pump, piping and copper rod for whirlpool. 18m copper immersion chiller. Burner converted from low pressure to high pressure reg - actually not that easy to source a bush to connect the 3 ring buner to the keg king high pressure rg.
Beer consumed but not produced.. But still a productive day!!