JaseH
Well-Known Member
- Joined
- 6/11/11
- Messages
- 573
- Reaction score
- 81
The last few weeks I've been gathering bits and pieces to build an electric 3 vessel AG brewing rig. Its not yet complete but its at stage currently where I could brew on it finally! I decided to do a dry run today to check everything out - was bloody hot in Melbourne, high 30's, but it went pretty well. Here are some pics!
The rig pre dry run:
Mash Tun false bottom:
Looking through the lid of the boil kettle:
Inside HLT with Keg King element:
My Mash Tun false bottom using male camlock fitting - works well, almost drains the mash tun completely.
During the 'dry run' with the Mash Tun wrapped in an old camp mat for insulation.
My high tech Blirkmann Bathometer/Evaporometer device:
Was bloody hot work slaving over an electric brew rig today! My brew partner struggled:
...then had to go cool off:
I cooled off in my own way
Cant wait to grab some grain during the week and give it a real run next weekend! :kooi:
The rig pre dry run:
Mash Tun false bottom:
Looking through the lid of the boil kettle:
Inside HLT with Keg King element:
My Mash Tun false bottom using male camlock fitting - works well, almost drains the mash tun completely.
During the 'dry run' with the Mash Tun wrapped in an old camp mat for insulation.
My high tech Blirkmann Bathometer/Evaporometer device:
Was bloody hot work slaving over an electric brew rig today! My brew partner struggled:
...then had to go cool off:
I cooled off in my own way
Cant wait to grab some grain during the week and give it a real run next weekend! :kooi: