AUHEAMIC
Peels
- Joined
- 4/9/06
- Messages
- 391
- Reaction score
- 3
Hi All
I am in the process of setting up an AG brewery. The 50ltr S/S boiler and 50ltr S/S mash tun are completed. March pump approved by the finance department (for a xmas present). I am now working on the HLT which I am going to put a 3/8 copper coil heat exchanger in.
Can anyone advise me on the length of 3/8 copper tube required?
I have done a search and have come up blank.
P.S. I have only joined as a member recently but you have all helped me with this obsession we call brewing over the last twelve months. Thank you all.
I am in the process of setting up an AG brewery. The 50ltr S/S boiler and 50ltr S/S mash tun are completed. March pump approved by the finance department (for a xmas present). I am now working on the HLT which I am going to put a 3/8 copper coil heat exchanger in.
Can anyone advise me on the length of 3/8 copper tube required?
I have done a search and have come up blank.
P.S. I have only joined as a member recently but you have all helped me with this obsession we call brewing over the last twelve months. Thank you all.