G’day brewers, I’m looking at downsizing my brewery and wanting to sell my setup, it’s got dual PID controllers with programable ramp and soak function, the HLT has a 1KW element and the HEX has a 2.4KW element, 2x mk11 magnetic drive pumps and a gas fired boil pot. This system easy puts out 40L...