Hi All,
I am going to upgrade my control panel from 2 boxes to 1 box and thought I'll put some RCD's in as well.
I will run a 15A and a 10A into the control box, the 15 will drive the HLT and Pump and the 10 will drive the HX.
I am thinking of having a switch between each PID and the element under control so I may turn the elements off while the pids are still on (monitor temp without heating etc..). A switch for the pump and anything else I can think of or put in latter
so for my silly Q.
Do I put in a 1 pole RCD or 2 pole RCD, whats the diff, I would have thought they should all be 2 pole ?
thanks
Matt
I am going to upgrade my control panel from 2 boxes to 1 box and thought I'll put some RCD's in as well.
I will run a 15A and a 10A into the control box, the 15 will drive the HLT and Pump and the 10 will drive the HX.
I am thinking of having a switch between each PID and the element under control so I may turn the elements off while the pids are still on (monitor temp without heating etc..). A switch for the pump and anything else I can think of or put in latter
so for my silly Q.
Do I put in a 1 pole RCD or 2 pole RCD, whats the diff, I would have thought they should all be 2 pole ?
thanks
Matt