remi
Well-Known Member
- Joined
- 23/1/08
- Messages
- 148
- Reaction score
- 4
after an excellent day's brewing, i thought i'd show off my new brewery which is finally up and running after a couple of months of planning/ purchasing/ putting together.
stainless steel vessels by beerbelly (50L, 50L, 70L)- insulated hlt and mash tun, element installed into hlt along with herms coil, stainless valves and camlocks from geordi, silicon hoses, italian burner from beerbelly, plate chiller, march pump, stainless bench, 50L stainless conical and i finally have a fermenting fridge. at present i manually switch the element and pump as i don't mind being hands on (having being used to jug transfers)- but in future, who knows? wayne did an absolutely fantastic job with the stainless pots- workmanship second to none.
knocked out a 23L batch of IPA a couple of weeks ago, but today managed to use the system to its capacity for a double batch of amber ale- which all went very smoothly.
i'm a happy boy...
remi
stainless steel vessels by beerbelly (50L, 50L, 70L)- insulated hlt and mash tun, element installed into hlt along with herms coil, stainless valves and camlocks from geordi, silicon hoses, italian burner from beerbelly, plate chiller, march pump, stainless bench, 50L stainless conical and i finally have a fermenting fridge. at present i manually switch the element and pump as i don't mind being hands on (having being used to jug transfers)- but in future, who knows? wayne did an absolutely fantastic job with the stainless pots- workmanship second to none.
knocked out a 23L batch of IPA a couple of weeks ago, but today managed to use the system to its capacity for a double batch of amber ale- which all went very smoothly.
i'm a happy boy...
remi