Show us your brewrig

Australia & New Zealand Homebrewing Forum

Help Support Australia & New Zealand Homebrewing Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Moad said:
I have 8KW to boil ~150L pre boil... gets a pretty good boil going
Direct link to the substation next door......damnnnnnnn
 
image.jpg
image.jpg
Here's mine. It's at version/upgrade #4 since going to AG back in 2008.
40lt HLT, 60lt jacketed mash tun, 60lt kettle, HEX, magnetic pump, STC 1000's for temp control, built in timer all flows controlled by ball valve including underletting in the mash tun. Now if only I could get the timer on the HLT to work.
Did two double batches back to back yeaterday (80lt) and not one spill.
 
Trying something new today. Using my 90 Ltr kettle and a big BIAB bag with the Herms. I cut some stainless perf and sat it ontop of a colander to make a false bottom. Seems to be going smoothly[emoji6]. 70 Ltrs of water and 12kg of grain is pretty well maxed out. Hoping to get 2 cubes of 1.060 ish Black IPA.
20170917_103936.jpg
20170917_103931.jpg
 
Last edited:
My grandmother would be turning in her grave if she saw that!
Funny you should say that. It's actually my great aunt ties table. I felt a bit guilty hacking into it with the multi tool. [emoji54]
 
Second brewday on the new rig. Loving the inline oxygen stone kit. Fermentation was cranking 2 hours after pitching.

20180309_104934.jpg
20180309_124556.jpg
20180309_104949.jpg
 
Here's mine...all home made from a cheap keg, flashed stc-1000+ controller with variable voltage regulators, kettle elements, bunnings shelving and a KK pump. Getting it dialled in nicely - yesterday's brew was a 1.051 pale ale which got about 90% mash efficiency and 78.5% BH efficiency.

7A0BD22B-5B3F-4F71-A756-A6BE6BD540B5_zpssokrqrho.jpeg


D365125D-1EB7-48C2-A0C7-375D9AE6674E_zpszwdjrazn.jpeg


D53197BA-90EE-4693-8786-091CE7270911_zpstseuu9f2.jpeg


341DE27F-54FC-4474-AE5E-D5B15383A677_zpstbgnj7dj.jpeg


BD706D61-3E10-4074-8498-64BEC7E20CC9_zpszb2ujhpi.jpeg


96981EAA-F218-4BC7-A143-4DA2B42C25D5_zpsvbkhthb2.jpeg


950FE362-454A-48B1-A561-488F8A732BC7_zpsagis7uya.jpeg


1CF4AF16-375C-4CEC-92DD-6FE1EE8287D9_zpsqqhbflsy.jpeg
 
Last edited:
Here's mine. New to the forum. Been brewing on this system for 6 months now. Gas fired BK. Gas also on the HLT to do the heavy lifting and then a 2000W element for maintaining temp. HERMS with 2 pumps. Basic Keg King temp controller to keep at target temp.
IMG_2485.jpg
Will eventually move to a proper electric panel, but that's way off..... For now, it's simple and it works.

Augo
 
I like gas but have decided to go electric in my setup currently under construction. The 50 litre boiler (which will be boiling about 36 litre batches) has 2 X 2200 watt elements. Currently working on the control panel; not as fancy as some but functional. I also decided to go gravity from the HLT.
 

Attachments

  • brewerymail.jpg
    brewerymail.jpg
    661.5 KB · Views: 380

Latest posts

Back
Top