I was building an all electric brewery as seen on www.theelectricbrewery.com. Im currently wiring the control panel that owes me about $1500 bucks. I also have
three Blichmann 20 Gallon G1 BoilerMakers, One for HLT, Mash Tun and Boil kettle. Each kettle has its own temp probe connected to a PID. Two pumps will be in opperation. I will be using 1 5500 element in the HLT and boil kettle. The mash will be pumped through a herms coil in HLT to maintain temp. This setup in total has set me back about $6000. I will post new pics soon.