Due to space constraints, I have switched to a Guten system, my old 3 vessel gravity system has to go, needs a quick scrub as has been sitting in the corner for a while
Location Hawthorn VIC, however can drop it off if not too far
Make me an offer - must go!
Boil Kettle - 50L Keggle
Ball Valve w.barb
Bazooka Screen
18m 1/2" immersion chiller w.hose fittings
Hot Liquor Tank - 50L Keggle
Ball Valve w.barb
Sight Glass + Spare glass
Thermowell
Glass Lid
2400w heating wand
Residual Current Device
2 ring burner + std. regulator
Mash Tun - 50L Keggle
Ball Valve w.barb
Thermowell
Insulative Jacket (barely drops temp)
Insulated Lid
Other
'Brewtree' - 1825H 1000W 400D (1975H with vessel)
OMAC Drago burner + variable regulator
Bungs
Stirplate
Assembly Instructions
Location Hawthorn VIC, however can drop it off if not too far
Make me an offer - must go!
Boil Kettle - 50L Keggle
Ball Valve w.barb
Bazooka Screen
18m 1/2" immersion chiller w.hose fittings
Hot Liquor Tank - 50L Keggle
Ball Valve w.barb
Sight Glass + Spare glass
Thermowell
Glass Lid
2400w heating wand
Residual Current Device
2 ring burner + std. regulator
Mash Tun - 50L Keggle
Ball Valve w.barb
Thermowell
Insulative Jacket (barely drops temp)
Insulated Lid
Other
'Brewtree' - 1825H 1000W 400D (1975H with vessel)
OMAC Drago burner + variable regulator
Bungs
Stirplate
Assembly Instructions
Attachments
-
BITS.jpg180.1 KB · Views: 158
-
BK IN.jpg156.9 KB · Views: 159
-
BK OUT.jpg183.4 KB · Views: 152
-
CHILLER.jpg237.1 KB · Views: 152
-
HLT IN.jpg178.7 KB · Views: 147
-
HLT OUT.jpg150.7 KB · Views: 146
-
MT IN.jpg182.5 KB · Views: 145
-
MT OUT.jpg178.3 KB · Views: 145
-
TREE 1.jpg264.8 KB · Views: 150
-
TREE 2.jpg267.6 KB · Views: 153