Using 3/8 ID Plastic beer line and at the moment the length is 1.5m, and I'm having bubbles in the beer line before the tap and after the keg.
Used the crozdog_balancing_table.xls.xlsx 126.76KB and its says I must use 11meters of beer line for 5deg and 1,8volume of Co2 and I used o height as my taps are pretty much level with centre of keg.
Can this be, as I don't have enough space for so much beer line?
Help!!
Used the crozdog_balancing_table.xls.xlsx 126.76KB and its says I must use 11meters of beer line for 5deg and 1,8volume of Co2 and I used o height as my taps are pretty much level with centre of keg.
Can this be, as I don't have enough space for so much beer line?
Help!!