I'm in the middle of building my new system. Should be able to make about 140 litre batches when I'm done.
Just got a march pump and installed some 1/2 inch ball valves on my new HLT, mash/lauter tun and kettle. I've also got some 19mm tubing.
What's the best way to connect the 19mm tubing to the 1/2 inch ball valves? Also how can I ensure the tubing is securely connected to the pump?
Just got a march pump and installed some 1/2 inch ball valves on my new HLT, mash/lauter tun and kettle. I've also got some 19mm tubing.
What's the best way to connect the 19mm tubing to the 1/2 inch ball valves? Also how can I ensure the tubing is securely connected to the pump?